overhead gantry crane presentation and composition

a large cranes overhead gantry crane, the structure of beams and columns was "door" shape, deliberate move on the track, starting with a larger weight. Currently shipyards,Bridge crane container yard cranes and divided into two types, namely, rail-mounted container cranes (RMG) and rubber-tyred cranes (RTG). overhead gantry crane rail-mounted container cranes that, Overhead bridge crane with energy saving, high reliability, lifting capacity, small maintenance workload, easy to automate operation. But its biggest drawback is inconvenient to shift position.
overhead gantry crane is mainly composed of cylindrical wheels, bumper, brake blocks, wire rope, lifting hooks, cab, reducer,rail mounted gantry crane pulley casting, casting reel, electric motors, electronic control equipment consists of the following components.
After rotating overhead gantry crane hook, wire rope hook on the kink together, this time can no longer be landing hook operation, or they may make one of the Rope damaged by excessive force, you can take the following approach:
   (1) Under heavy ground is not high and the performance permit crane, gantry crane with luffing methods can put weight down, crane hoist then put a positive spin hook.
   (2) If the weight has been lifted high off the ground, you can only think of a way close to the surrounding buildings, or other person gantry crane hanging cage to spin positive hook.
   (3) In the event the hook rotated, the rope should be released within the gantry torque, the specific method is: Bridge crane to hook into the ground and untied the rope fixed end, in accordance with the rotation of the hook m multiplied by the number of turns of wire rope n is the number of matches cardinality k (as the case may increase or decrease), shares in the reverse direction by rope twist, turn the end of the rope to release torque, and then install the fixed end. Boom will play a maximum elevation of lifting machinery, repeated several times to check the effect of hook ups and downs, you can repeat the above steps until the hook is stable.

2014年7月14日星期一

Introduction garbage grab crane


Garbage grab crane for municipal solid waste and hazardous waste incineration plants or municipal solid waste composting plant waste feed system, is mainly responsible for garbage feeding, handling, mixing, weighing extract and work. Enables manual control, semi-automatic control,cranes for the steel industry automatic control mode of operation, with automatic capture, automatic repeat feeding, automatic repeat inverted stack, automatic parking and other processes, and has a large lifting height of the anti-swing, real-time dynamic measurement, grab condition monitoring, fault diagnosis automatic alarm, remote diagnosis and reporting statistics. explosion-proof electric hoistGarbage grab crane can also be achieved slowly for sustained feeding fluidized bed boiler, which is set according to the material needs of the grab open discharge opening and the duration of the process by avoiding feeding mouth "bridge."

2014年4月15日星期二

overhead crane inspection and maintenance of six months

1 ) Check all gear reducer and wear, pitting damage to the Overhead bridge crane tooth surface should not exceed 30% of the engagement surface and a depth of not more than 10% of the original thickness of the tooth (fixed chord tooth thickness ) ; wear of gear tooth thickness percentage of the original tooth thickness does not exceed 15% to 25% ; checks bearing the state ; replace oil .
2 ) Check the large and small wheels condition, lubricate the wheel bearings to eliminate the phenomenon of gnawing track .
3 ) Check the main Bridge gantry crane beam, the beam end whether to open the main seam welding, corrosion phenomena , rust should not exceed 10 % of the original thickness of the main force components whether fatigue cracks ; various rails , brackets are intact ; inspection girder, end beam and tighten the bolt again .
4 ) Check the main beam deformation . Check rail trolley case . Under no-load main beam interference should not exceed their span of 1/ 2000 ; beside the main beam bent inwards level shall not exceed 1 /1500 to measure length ; trolley rail track should produce the phenomenon , the top surface and side rail wear ( sided ) volume must not exceed 3mm.
5 ) Check the KS Crane Group reel , the reel wall wear should not exceed 20 % of the original thickness of the rope groove convex peak does not strain sharp .
6 ) All bolts and tighten the fastening bolts on the crane .

2014年4月11日星期五

bridge gantry crane girder structure according to the classification by primary forms

1 single girder gantry crane
Single Bridge gantry crane cantilever structure is simple, easy to manufacture and installation, small own quality, main beam, mostly off-track box-shaped frame structure. Compared with the double girder gantry crane, the overall stiffness of the weaker. Therefore, when the starting weight Q ≤ 50t, when the span S ≤ 35m, can use this form. Single girder cranes door main gate leg has L and C forms. Facilitate the manufacture and installation of L-type, the forces better, the smaller their quality, but the leg lifting cargo through space at a relatively small number. C-leg formed inclined or curved shape, the purpose is to have a large lateral space for the goods pass feet.
2 double girder bridge crane
Double girder gantry crane carrying capacity, span, good overall stability, variety, but the quality of their starting weight compared with the same single-girder gantry crane to be bigger, the cost is higher. Depending on the structure of the main beam, can be divided into two box girders and trusses form. It is generally use more box-shaped structure.

2014年3月25日星期二

Bridge crane

Bridge crane bridge is a bridge crane runs on an elevated track , also known as the crane . bridge crane bridge laying along the elevated tracks on both sides of the longitudinal running , lifting trolley along the track laid on the bridge sideways , forming a rectangular scope of work , you can take advantage of the space under the bridge lifting materials , not hampered by ground equipment .
Bridge gantry crane is widely used in indoor and outdoor warehouses, factories , docks and open storage yard , etc. . Bridge crane bridge crane can be divided into ordinary , simple beam bridge crane bridge crane and metallurgical dedicated three.
General overhead cranes generally lifting trolley , bridge run institutions , bridge metal structures. Lifting trolley and hoisting mechanism consists of the trolley run institutions and small frame of three parts.
Lifting mechanism includes a motor , brake , reducer, drum and pulley . Motor through reducer, driven reel rotation, so the rope from around the reel or roll down to lift heavy objects . Small frame is the bracket and install the hoisting mechanism and operating agencies and other parts of the car chassis , usually welded structures .

2014年1月23日星期四

Bridge crane

When the load on the main girder span camber should be F = LK1000 (0.9 ~ 1.4) (wherein LK-based beam span), but the crane in use, often due to overload, thermal radiation and repair bridge gantry crane irrational factors such as main beam camber disappear. From a city crane factory to investigate the plant manufactured products tested 106 quay cranes situation, the result is the use of the arch disappeared after 1 year, 2-5 years 20% of the arch disappeared 30% to 50%. use 5-10 years more than 60% on the arch disappeared almost entirely disappeared more than 10 years, and produce under torsion, seriously affecting the safety in production. Disappearance of the main beam camber is essentially metal structure deformation. This will cause a malfunction size car run institutions, resulting in wheel overhead gantry crane size skew span error increases, which will affect the smooth operation of the trolley car safety gauge changes, the size of the car, "bite the Road" serious phenomenon. Main beam deflection will produce severe lower level next bend plate waves increases.

2014年1月22日星期三

Overhead crane parameter identification based on energy conservation

Two degrees of freedom of the bridge crane , due to the driving characteristics of a system input that transport overhead gantry crane the crane swing accompanied the load, which increases the difficulty to accurately position the load handling control . Around the bridge crane anti- sway control launched a lot of research . Presents a hierarchical sliding mode control method , the system state is divided into two groups were constructed sliding plane, control the amount of each sub- sliding surface contains the equivalent control component so as to ensure the system state of each sub- sliding along the slip plane . The establishment of a fuzzy control system, four-input single-output fuzzy controller is optimized for two pairs of input single-output fuzzy controller and a weighted composite of the two outputs. Prediction and compensation based on disturbance eot crane feedforward and feedback controller is designed to effectively eliminate the influence of nonlinear friction of the cable car system. However, numerous studies including the above literature , including both known to stay in the assumed model simulation stage , and no model parameter identification in-depth study . Mathematical models for controller design overhead crane is very important , so the controller based on a simple model structure obtained applications. Common method of system identification of an energy law and CAD models. Accuracy of the components illustrated AutoCAD CAD model method relies on the system , the process can not be accurate.