Introduction
Lifting industry using PLC- inverter gradually in recent years to promote and popularize , especially in large lifting equipment , with PLC program control to replace the traditional relay - contactor control ; replaced with a variable speed motor winding series resistance rotor speed ; asynchronous motor with inverter motor or replace the motor winding , coupled with advanced fieldbus technology and HMI system to improve the control accuracy and stability of the equipment , reduce the failure rate , and the energy-saving effect is remarkable , easy repair and maintenance , improve production efficiency to become a good way .
Control scheme
A large heavy machinery manufacturing plants, bears all the bulky equipment assembly , positioning, docking and other tasks, the
overhead gantry crane high performance requirements , the use of an overhead crane used QD250/50t siemens S7-400 PLC, ABB inverter , touch screen and other high-performance configuration, application of advanced Profibus fieldbus technology , with encoder feedback direct torque control, and advanced human-machine interface system.
Divided into the main bridge crane hook, deputy hook , carts , trolleys and other four parts. Due to the main
eot crane hoisting mechanism in most typical applications , control is also the most complex , so the main hoisting example in this chapter detailing its control.
1, PLC
The whole system S7-400 PLC as the core of electronic control , the main power supply module , CPU, input and output modules and interface modules and other components. Acquisition by a limit switch input modules , thermistors, inverter and other equipment fault feedback signal state ; receiving master controller , buttons, switches send control commands concentrated in the CPU operation and program operation result output module and Profibus fieldbus send contactors and inverters perform device to the drive motor , hydraulic brake , cooling fan and other complete various production tasks.
2, Profibus fieldbus system serial communication
Profibus is an open serial communication standard that enables data exchange between various automation components . In this system with S7-400 as the main station to the agencies as a slave drive by DP interface module and RS485 shielded twisted rapid real-time data exchange .
Set the inverter communication parameters :
98.02 = fieldbus communication module activation
51.01 = Profibus-DP field bus type selection
51.02 l = 3 to set the main inverter station address
51.03 = 1500 selected communications transmission rate of 1.5Mbit / s
51.04 = PPO4 select data type 4 ( 6 process data as a standard block )
As a master PLC CPU reads from the slave state of various input information, namely primary l read from the drive status word and actual values, including the drive is ready , power- response operation, the torque verification OK, inverter failure , the actual motor speed and other information ; and write information to a variety of output from the station , about the control word and speed reference written inverter. Including communications test position, from fieldbus PLC system Drive on, the start signal from the host system , fault reset signal and the actual frequency reference and so on. The complex signal conversion , monitoring, feedback process all data transmission via Profibus chain , and CPU quick focus easily .
3 , advanced man-machine interface system
TP270 touch screen and PLC Profibus bus is also used for data transmission and exchange , real-time display and monitor the operational status of the agencies and the voltage, current, torque, speed and other operating parameters , and can use its own real time fault diagnosis system Symptom judge , recording failure of various parameters , so that operators and maintenance personnel can fully understand the state of the system in a timely manner , and may prompt fault information to inspection and maintenance , to achieve accurate and fast troubleshooting effect , the real achieve a human intelligence .
4, the frequency control system
1 ) Lifting conditions and requirements
Hoisting mechanism requires a larger speed ratio and mechanical characteristics of hardness to suit the precise weight lifting requirements ; require a large starting torque ,bridge gantry crane excellent dynamic torque response ability to adapt to sudden load change , ensure that the heavy secondary lifting capacity ; must solve regenerative braking energy feedback and processing, in order to shorten the deceleration stopping time ; slide the hook must solve the problem .
2 ) conversion function application
According to the hoisting mechanism characteristics and technical requirements , the drive uses with a tachometer feedback interface 800 series drives, with ACC 7.2 Special upgrade software , form a closed loop direct torque control, through the pre-excitation function and starting torque setting , the motor starts instantaneous torque up to 300 %, achieved an excellent starting characteristics . built-in brake chopper , external braking resistor , braking process so that the generation of energy through regenerative braking resistor to be released , to achieve the purpose of rapid braking . Using a mechanical brake control function, so that the motor torque and brake release closely with better improve the safety of the equipment , the ability to withstand the impact of frequent starting and reliability also increased significantly .
Overhead crane is Hengjia in workshops, warehouses and empty field for material lifting material lifting equipment. Because of its ends located in the tall concrete pillars or metal bracket, shaped like a bridge. Overhead crane overhead bridge along the laying of tracks on both sides longitudinally running, you can take advantage of the space under the bridge lifting material from ground equipment obstacles. It is the most widely used, the largest number of a lifting machinery.