bridge gantry crane

bridge gantry crane

2013年8月13日星期二

Lifting machinery management system

In order to strengthen the management of lifting machinery, lifting machinery to ensure proper operation and safety, the system is formulated. The management system for bridge cranes, gantry cranes, loading bridges (tower) cranes, gantry cranes, truck cranes, tire cranes, crawler cranes, lifts, hoist, electric hoist and so on. Does not apply to railway gantry cranes, lifting equipment underground mines, manned lifting equipment. Enterprises should be based on lifting the type, quantity and complexity of setting up the device power management department full-time or part-time engineering and technical personnel responsible for the management of lifting machinery. The use of units should establish the necessary lifting machinery repair and maintenance, periodic testing, operation, safety rules and other rules and regulations shift system.
Lifting machinery must be registered by one and create the device files. Files should include product certification, quality certificate, original drawings and other technical information, as well as running records, previous technical inspection reports, overhaul, change the original design performance and major accident records. A variety of different models of lifting machinery must press the GB6067-85 "crane safety regulations" provisions appropriate safety protection devices installed, tower
overhead gantry crane to add a little weight. Various rope selection, use and disposal must meet code requirements. Lifting workplace have adequate lighting and lifting channel, and should be near the equipment, buildings and electrical lines, such as maintaining the required safety distance. Lifting the implementation of a dedicated system, each lifting machinery must be used by the person responsible management.

没有评论:

发表评论