Mechanical hoist installation team can choose a qualified manufacturer, forming manufacture, installation, commissioning one-stop service model. In addition, the selected installation unit must be a provincial quality and technical supervision department issued a "special equipment installation (maintenance) safety approval certificate" of the professional team, and has a starting weight of the installation installs the appropriate qualifications.
gantry crane mounted units determined before installation to assist in the installation of special equipment operating units for processing reports, and check the installation team of construction organization plan, installation of equipment, installation procedures, technical requirements, the installation process concealed work records, self-reports, etc. meet the requirements. After installing the unit to supervise the installation and operation of a comprehensive self-test, load test, self-test confirmed after passing the reporting agency to install special equipment inspection and acceptance.
Gantry crane acceptance and made "safe use permit" only after put into use.
hoist gantry crane acceptance, and use of the hoist should Random technical information, installation and inspection reports and other relevant technical data archiving. Later in the use of our regular inspection, repair, alteration, accident records and other information can also be stored in
bridge gantry crane safety technology file.
Overhead crane is Hengjia in workshops, warehouses and empty field for material lifting material lifting equipment. Because of its ends located in the tall concrete pillars or metal bracket, shaped like a bridge. Overhead crane overhead bridge along the laying of tracks on both sides longitudinally running, you can take advantage of the space under the bridge lifting material from ground equipment obstacles. It is the most widely used, the largest number of a lifting machinery.